Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted GCA's up)
(14 intermediate revisions by the same user not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== AJA Sputter 4: UP =====
+
===== Thermal Evap #1: DOWN =====
  +
We are waiting for parts to come in to complete the repair on the Bell Jar hoist.
Computer repaired.
 
  +
We will notify once the system becomes available for use.
// [[User:John d|John d]] 07:50, 13 September 2022 (PDT)
 
 
// [[User:John d|John d]] 17:06, 3 October 2022 (PDT)
   
===== GCA AutoStep Service =====
+
===== E-Beam#2: Heater Down =====
  +
EB2 Heated Processing is down
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates:
 
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
 
9-28-22 at 8:00am to 9-29-22 at 5:00pm
 
 
// [[User:John d|John d]] 10:15, 1 September 2022 (PDT)
 
   
 
===== MLA 150 Service & Software Revision =====
 
===== MLA 150 Service & Software Revision =====
Line 32: Line 30:
 
===== ASML Up; Network status =====
 
===== ASML Up; Network status =====
   
We are running a newer computer;
 
 
Nanofiles sync & JobCreator functionality is in the process of being restored.
 
Nanofiles sync & JobCreator functionality is in the process of being restored.
  +
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
   
// [[User:John d|John d]] 09:00, 22 July 2022 (PDT)
+
// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 17:08, 3 October 2022

Important Announcements


Thermal Evap #1: DOWN

We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// John d 15:44, 29 September 2022 (PDT)