Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Updated that tools are up but gas is down)
(deleted GCA's up)
(24 intermediate revisions by 3 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== All Chlorine gasses disabled =====
+
===== Thermal Evap #1: DOWN =====
  +
We are waiting for parts to come in to complete the repair on the Bell Jar hoist.
There is a leak in our Cl2 gas cabinet that we are currently addressing.
 
  +
We will notify once the system becomes available for use.
 
// [[User:John d|John d]] 17:06, 3 October 2022 (PDT)
   
 
===== E-Beam#2: Heater Down =====
All Cl2 processes will be down until we have finished replacing the necessary lines/fittings. Cl2 gas will most likely be down all day tomorrow and part of Tuesday. We will have a better estimate once we break open the lines.
 
  +
EB2 Heated Processing is down
  +
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
   
  +
===== MLA 150 Service & Software Revision =====
Most tool running Cl2 are up, but you may NOT run any Cl2 gas on these machines until the lines have been repaired.
 
   
  +
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th.
An email will go out once we have an update.
 
// [[User:John d|John d]] 12:47, 28 August 2022 (PDT)
+
// [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT)
   
 
===== ASML Up; Network status =====
 
===== ASML Up; Network status =====
   
 
Nanofiles sync & JobCreator functionality is in the process of being restored.
We are running a newer computer;
 
  +
Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
Nanofiles sync & JobCreator functionality will be restored in the next few weeks.
 
   
// [[User:John d|John d]] 09:00, 22 July 2022 (PDT)
+
// [[User:John d|John d]] 15:44, 29 September 2022 (PDT)
 
===== Face-Masks Optional as of June 13 =====
 
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
 
 
We will still provide masks at the metal table in front of the cleanroom entry.
 
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
 
 
See the full policies at '''[[COVID-19_User_Policies]]'''
 
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 
 
===== New EBL Rates =====
 
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
Industrial Users: $405/hour
 
 
UC Academic Users: $126/hour
 
 
Non-UC Academic Users: $150/hour
 
 
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 17:08, 3 October 2022

Important Announcements


Thermal Evap #1: DOWN

We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// John d 15:44, 29 September 2022 (PDT)