Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(asml and unaxis updates) |
(deleted GCA's up) |
||
(40 intermediate revisions by 4 users not shown) | |||
Line 14: | Line 14: | ||
<!------------- Equipment Status ----------------> |
<!------------- Equipment Status ----------------> |
||
− | ===== |
+ | ===== Thermal Evap #1: DOWN ===== |
+ | We are waiting for parts to come in to complete the repair on the Bell Jar hoist. |
||
− | New bottle of Deuterated Silane (SiD4) has been installed, we are running process qualifications. |
||
+ | We will notify once the system becomes available for use. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 17:06, 3 October 2022 (PDT) |
− | ===== |
+ | ===== E-Beam#2: Heater Down ===== |
+ | EB2 Heated Processing is down |
||
− | We don't yet have a tracking number for the Hardware delivery, so it's possible it does not arrive tomorrow (due to supply chain problems). We are expecting to have ASML engineers on-site next week to begin some of the repairs. Tool will be down into next week at least, depending on the hardware delivery schedule. We have possibly repaired two of the failures that required new hardware - will verify next week when ASML engineers are on-site. |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 15:40, 21 September 2022 (PDT) |
− | ===== |
+ | ===== MLA 150 Service & Software Revision ===== |
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
+ | The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. |
||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
⚫ | |||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
+ | ===== ASML Up; Network status ===== |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
⚫ | |||
+ | Nanofiles sync & JobCreator functionality is in the process of being restored. |
||
− | ===== PureStrip Bath Heater DOWN ===== |
||
+ | Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested. |
||
− | The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. |
||
⚫ | |||
⚫ | |||
− | ===== Gasonics Down ===== |
||
− | Leak in main chamber, tool is down. |
||
− | // [[User:John d|John d]] 14:35, 27 May 2022 (PDT) |
||
− | |||
− | ===== New EBL Rates ===== |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
− | |||
− | Industrial Users: $405/hour |
||
− | |||
− | UC Academic Users: $126/hour |
||
− | |||
− | Non-UC Academic Users: $150/hour |
||
− | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
− | |||
− | //[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST) |
||
<!---------- end of Equipment Status ------------> |
<!---------- end of Equipment Status ------------> |
Revision as of 17:08, 3 October 2022
Important Announcements
Thermal Evap #1: DOWN
We are waiting for parts to come in to complete the repair on the Bell Jar hoist. We will notify once the system becomes available for use. // John d 17:06, 3 October 2022 (PDT)
E-Beam#2: Heater Down
EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)
MLA 150 Service & Software Revision
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)
ASML Up; Network status
Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.
// John d 15:44, 29 September 2022 (PDT)