Template:Announcements

From UCSB Nanofab Wiki
Revision as of 12:18, 23 February 2024 by John d (talk | contribs) (deleted EB4, other tools up. Updated ICP1 and DSE from emails.)
Jump to navigation Jump to search
RIE 5 is up

RIE 5 is up except for processes that use SiCl4.

//Vraj Mehalana 09:39, 30 January 2024 (PST)

Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update

We were able to start running recipes last night but we found the C4F8 MFC wasn’t controlling. I’ve ordered a new MFC that’s due to be on site Tuesday morning. If all goes well the tool should be up that afternoon. //Demis D. John 11:18, 23 February 2024 (PST)

ICP #1 is down - Update

Some additional work is needed on the replacement board that we are waiting on. I have been informed that it will not be shipping until after the 20th (no solid date). //Demis D. John 11:18, 23 February 2024 (PST)

EBeam3 Transfer Arm Upgrade - Postponed

The Transfer Arm upgrade has been postponed again, this time due to motor driver compatibility issues.

I am waiting to hear back from the manufacturer so at this time I can not reschedule yet.

I will send another notification when everything has been worked out, and I am ready to schedule the installation.

//Demis D. John 11:56, 13 February 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)