Template:Announcements

From UCSB Nanofab Wiki
Jump to navigation Jump to search

Stepper #1 (GCA 6300) - Scheduled Maintenance

The tool will be undergoing maintenance and be unavailable the following dates and times:

1-18-24 at 8:00am to 1-18-24 at 6:00pm

Please plan your processing activities accordingly.

Bill Millerski

//Vraj Mehalana 21:49, 21 December 2023 (PST)

Stepper #2 (GCA Autostep 200) - Scheduled Maintenance

The tool will be undergoing maintenance and be unavailable the following dates and times:

1-15-24 at 8:00am to 1-17-24 at 6:00pm

Please plan your processing activities accordingly.

//Vraj Mehalana 21:49, 21 December 2023 (PST)

DUV is down - Update

Parts were scheduled to arrive last Thursday but were delayed due to the weather that day. Tracking status never updated from pending after that point so I had to wait 7 days before filing a claim with FEDEX. Hopefully the claim and associated dollar value will get them to start looking for the package, and we are also exploring other options.

I'll hopefully send out another update late next week with some idea of when we will have parts. //Vraj Mehalana 15:27, 2 January 2024 (PST)

PECVD2 Planned Down Time for Maintenance 12-11-23

PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.

When the work is complete, the process group will be running tests for the remainder of the afternoon.

//Vraj Mehalana 14:07, 13 December 2023 (PST)

Year End Shutdown

We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.

//Vraj Mehalana 14:39, 16 November 2023 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App".

// John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)