Template:Announcements

From UCSB Nanofab Wiki
Revision as of 15:05, 15 June 2018 by John d (talk | contribs) (stepper 2 up)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Stepper #2 Up

The service and repair of the Autostep is complete. Please let us know immediately if you have any issues.The system is up and ready for your use. // John d 15:05, 15 June 2018 (PDT)

RIE#5: SiCl4 Up

SiCl4 gas is available again on RIE #5. The maximum flow rate is 10 sccm. // John d 16:17, 12 June 2018 (PDT)

AFM Down

The laser/laser focus is struggling on the AFM. We have taken the AFM head to Bruker for a tune-up/repair. The system will be down until some time this week. // John d 16:17, 12 June 2018 (PDT)

Solvent Bench Bay 7 - Heated Bath

We have disabled the auto refill due to a high water level. Please use the manual fill and a manual drain button at the center top of the head case. Users of the bath might need to fill or drain as you insert/remove your beakers. Please be careful with other user's beakers. // John d 17:18, 6 June 2018 (PDT)