Template:Announcements

From UCSB Nanofab Wiki
Revision as of 16:55, 24 April 2018 by John d (talk | contribs) (deleted ADT)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Stepper #2 AutoStep: Down

We lost a motor in the mask aligner. Vendor is being contacted for repair. The motor is scheduled to be delivered tomorrow morning. We will send out an email tomorrow when I have more information. // John d 16:45, 24 April 2018 (PDT)

PECVD#2 Upgrades in progress, Retraining required

Plasmatherm is still upgrading the system software. The user interface will be completely different from the previous software, so all users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions once the upgrade is complete. // John d 12:51, 24 April 2018 (PDT)

RIE#5 Up

RIE #5 is up for use, including SiCl4. // John d 11:45, 20 April 2018 (PDT)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)