Template:Announcements

From UCSB Nanofab Wiki
Revision as of 08:37, 21 February 2018 by John d (talk | contribs) (removed ICP#1)
Jump to navigation Jump to search

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)


JEOL SEM #2: Up Overnight

System up for use tonight only (2018-02-20). JEOL service returning on Wed for permanent fix, system will be down on Wed. // Posted: 17:35, 20 February 2018 (PST)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)