Template:Announcements

From UCSB Nanofab Wiki
Revision as of 11:40, 10 February 2020 by Silva (talk | contribs)
Jump to navigation Jump to search

Equipment Status


GCA 6000 March Maintenance

The GCA 6300 will be down for maintenance beginning 8:30am Monday March 9, 2020 until 6:30pm March 11, 2020. Silva 10:40, 10 February 2020 (PST)

GCA Autostep 200 March Maintenance

The Autostep 200 will be down for maintenance the morning of March 12, 2020 until late afternoon the same day. Silva 10:40, 10 February 2020 (PST)

SignupMonkey Testing: Fri Feb 7th, 7am

We will be running tests on the SignupMonkey servers at 7am on Friday Feb. 7th. This may cause temporary outages of the server at this time. // John d 23:04, 29 January 2020 (PST)

N2 Dry Box Cleanout, February 14th

We will be cleaning out the large N2 dry box next to the ASML. Anything with a label that's older than 2 months will be removed. As a reminder, the dry box is for active processing only. If you would like to store anything in a N2 only environment for greater than two months please use the vacuum sealer (in bay 4). Please let me know if you have any questions or concerns. Hopkins a 16:07, 23 January 2020 (PST)

ASML Maintenance: March 30th

ASML periodic maintenance will be on Monday March 30th, system will be down for up to 1.5 weeks. // John d 07:30, 27 January 2020 (PST)

Unaxis ICP-PECVD

The ICP-PECVD module is down for general use. We are conducting experiments with the Deuterated Silane and are not allowing general use of the tool. Silva 15:04, 19 November 2019 (PST)

Suss Bonder

Suss Bonder is DOWN. The vendor is struggling to get the software and hardware upgrades to work. We have a meeting next week, 10/28/19, to discuss options. Silva 11:16, 25 October 2019 (PDT)