Template:Announcements
UCSB NanoFab Announcements
Stepper #2 AutoStep: UP
One RMS motor and motor control board was replaced. I ran setup without error. The system is up and ready for your use. // John d 12:50, 25 April 2018 (PDT)
PECVD#2 Upgrades in progress, Retraining required
Plasmatherm is still upgrading the system software. The user interface will be completely different from the previous software, so all users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions once the upgrade is complete. // John d 12:51, 24 April 2018 (PDT)
The SiCl4 gas line is down until next week when we can change the gas panel. // John d 16:15, 26 April 2018 (PDT)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)