Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(lab card/iris access, Symmetry app and updates)
Line 5: Line 5:
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
   
=====EBeam2 UP=====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
 
 
=====ProbeStation scheduled IT maintenance=====
 
=====ProbeStation scheduled IT maintenance=====
 
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting
 
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting
Line 16: Line 16:
 
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
=====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am=====
 
We are still working on an improved GapFill recipe.
 
 
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,
 
 
- starting Monday Oct 30th, evening at 5pm,
 
 
- ending Wed Nov 1st, morning at 6am.
 
 
Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.
 
 
Let me know if you have any questions.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
Line 37: Line 22:
 
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
   
=====EVG Activation: Up=====
 
The FSE has completed the work on the tool and I have made several test runs without issue.
 
 
IMPORTANT - Please see corresponding email for changes in operation.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.

Revision as of 14:49, 7 November 2023

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details. //Vraj Mehalana 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

ProbeStation scheduled IT maintenance

The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting //Vraj Mehalana 14:29, 3 November 2023 (PDT)

PECVD2 is down

We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again. //Vraj Mehalana 16:48, 31 October 2023 (PDT)

Wafer Bonder, (Suss SB6-8E)

The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.

//Vraj Mehalana 09:59, 20 September 2023 (PDT)