Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(FCB update)
(Unaxis Etch Down)
Line 13: Line 13:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  +
  +
===== Unaxis Etch: Down =====
  +
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
  +
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
   
 
===== Flip-Chip Bonder repair =====
 
===== Flip-Chip Bonder repair =====

Revision as of 10:35, 13 February 2023

Important Announcements


Unaxis Etch: Down

We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony // John d 09:35, 13 February 2023 (PST)

Flip-Chip Bonder repair

The repair and testing for the heated plates is complete but the controllers are still in WIP. They are expecting to ship everything mid next week. Given the time to ship and clear customs I anticipate receiving and installing the heaters the week of February 20th. -- Tony // John d 09:34, 13 February 2023 (PST)

Dektak XT ready for training

We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please contact the tool supervisor. // John d 10:08, 7 February 2023 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)