Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(updated oxford)
Line 41: Line 41:
 
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
 
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
   
==== Oxford Cobra ICP Etch ====
+
===== Oxford Cobra ICP Etch =====
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair.
+
ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will be shipping the parts we need for repair on Friday. Hopefully they will arrive Monday and the system will be operational Tuesday afternoon. I will update you all if that schedule changes.
// [[User:Silva|Silva]] 07:23, 25 January 2023 (PST)
+
// [[User:John d|John d]] 09:50, 26 January 2023 (PST)
   
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Revision as of 10:50, 26 January 2023

Important Announcements


Dektak XT in qualification

We have replaced the Dektak 6M with a new Dektak XT profilometer. We are currently qualifying the tool, we'll send an email when it's ready for training. // John d 10:39, 25 January 2023 (PST)

Blue-M oven: Down

BlueM down until further notice. Looking into blown fuse issues. // John d 15:37, 19 January 2023 (PST)

Stepper #1 GCA 6300: maintenance

This tool has been scheduled for maintenance and will be unavailable for the following dates/times:

1-23-23 12:00pm till 1-23-23 5:00pm 1-26-23 8:00am till 1-27-23 8:00am // John d 15:01, 19 January 2023 (PST)

Stepper #2 AUtostep200: maintenance

This tool has been scheduled for maintenance and will be unavailable for the following dates/times:

1-23-23 8:00am till 1-23-23 12:00pm 1-24-23 8:00am till 1-26-23 8:00am // John d 15:35, 19 January 2023 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

Oxford Cobra ICP Etch

ICP power supply has failed. We have requested a replacement from the vendor and a timeline for repair. Oxford will be shipping the parts we need for repair on Friday. Hopefully they will arrive Monday and the system will be operational Tuesday afternoon. I will update you all if that schedule changes. // John d 09:50, 26 January 2023 (PST)