Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (sig fix)
Line 25: Line 25:
 
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
 
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
   
===== JEOL SEM #2: Up =====
+
===== JEOL SEM #2: Down =====
  +
Load Lock problem.
System is up, gate valve fixed.
 
// [[User:John d|Posted:]] 16:01, 13 February 2018 (PST)
+
// [[User:John d|John d]] ([[User talk:John d|talk]]) 13:40, 14 February 2018 (PST)
   
 
===== Cary 500 Down =====
 
===== Cary 500 Down =====

Revision as of 14:40, 14 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

ASML: Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2: Down

Load Lock problem. // John d (talk) 13:40, 14 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)