Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (sig)
m (remove spaces)
Line 15: Line 15:
 
===== Announcements =====
 
===== Announcements =====
 
There are no general announcements at this time.
 
There are no general announcements at this time.
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
+
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
   
 
===== Gasonics Down =====
 
===== Gasonics Down =====
 
Check email for updates.
 
Check email for updates.
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
+
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
   
 
===== ASML Up =====
 
===== ASML Up =====
 
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
 
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
+
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
   
 
===== JEOL SEM #2 =====
 
===== JEOL SEM #2 =====
 
Problem with load lock gate valve. Currently down.
 
Problem with load lock gate valve. Currently down.
// [[User:John d|Posted:]] 15:40, 8 February 2018 (PST)
+
// [[User:John d|Posted:]] 15:40, 8 February 2018 (PST)
   
 
===== Cary 500 =====
 
===== Cary 500 =====
 
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.
 
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector.
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
+
// [[User:John d|Posted:]] 15:06, 7 December 2017 (PST)
   
 
<!---------- end of announcements ------------>
 
<!---------- end of announcements ------------>

Revision as of 11:16, 12 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics Down

Check email for updates. // Posted: 10:14, 12 February 2018 (PST)

ASML Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2

Problem with load lock gate valve. Currently down. // Posted: 15:40, 8 February 2018 (PST)

Cary 500

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Locating replacement PMT detector. // Posted: 15:06, 7 December 2017 (PST)