=====MLA 150 Service Next Week - REMINDER=====
+
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
  +
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
The MLA 150 will be down for a service visit from Tuesday February 6th to Thursday February 8th. The tool should be available in the evenings and it's possible the work will be completed by the end of Wednesday.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
Here's the schedule for when the tool will be unavailable:
 
 
=====MA6 TSA is down - Update=====
  +
After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.
   
Tues (2/6): 11:30 am - 5 pm
 
   
  +
I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.
Wed (2/7): 8 am - 5 pm
 
 
Thurs (2/8) 8 am - 5 pm (if needed).
 
   
 
-Lee
 
-Lee
   
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 1 February 2024 (PST)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT)
=====MJB-3 Service Next Week - REMINDER=====
 
The MJB-3s will be unavailable Thursday Feb. 8th for their annual service visit.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 1 February 2024 (PST)
 
   
=====MA6 Service Next Week - REMINDER=====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
The MA-6 will be unavailable Tuesday Feb 6th from 8 am to roughly 5 pm for its annual service visit.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
The issue with the backside camera magnification getting stuck will be addressed during the visit.
 
   
  +
=====ASML optics replacement May 20th-22nd=====
-Lee
 
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
   
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 1 February 2024 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
=====RIE 5 is up=====
 
RIE 5 is up except for processes that use SiCl4.
 
   
 
=====ICP1 Down=====
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update=====
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
We have disassembled the entire chamber lid assembly. I have put an order in for all the necessary replacement parts and am waiting to hear back on the lead time for a couple of the items. I should have an update tomorrow.
 
 
Thanks,
 
 
-Aidan
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
 
=====ICP #1 is down=====
 
The tool remains down. We did not find any "smoking gun" with the PC but did find that the PC's power supply had a non functional fan and the power supply did not test as good (granted it would still power up the PC). We will continue troubleshooting the PC issue in the morning.
 
 
-Lee
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
=====EBeam3 Planned Maintenance 2/7/24 - 2/8/24=====
 
EBeam3 is scheduled to be down starting at 8:00am on 2/7/24 through 4:00pm on 2/8//24 so that we can install the new transfer arm.
 
 
Please plan accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:28, 26 January 2024 (PST)
 
=====Oxford Cobra: Software bugs=====
 
The latest revision of software has several bugs: see email for details. We are working with Oxford to resolve via software upgrade.
 
// [[User:John_d|Demis D. John]] 10:08, 17 January 2024 (PST)
 
 
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
 
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   

Latest revision as of 14:41, 13 May 2024

Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair

I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis

//Vraj Mehalana 13:42, 9 May 2024 (PDT)

MA6 TSA is down - Update

After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.


I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.

-Lee


//Vraj Mehalana 14:41, 13 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)