Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
 
(43 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====EBeam3 Planned Maintenance 2/7/24 - 2/8/24=====
+
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
  +
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
EBeam3 is scheduled to be down starting at 8:00am on 2/7/24 through 4:00pm on 2/8//24 so that we can install the new transfer arm.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
Please plan accordingly.
 
  +
=====MA6 TSA is down - Update=====
  +
After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.
   
//[[User:Mehalana v|Vraj Mehalana]] 09:28, 26 January 2024 (PST)
 
=====Oxford Cobra: Software bugs=====
 
The latest revision of software has several bugs: see email for details. We are working with Oxford to resolve via software upgrade.
 
// [[User:John_d|Demis D. John]] 10:08, 17 January 2024 (PST)
 
   
  +
I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.
=====ASML Maintenance: Jan 29th-31st=====
 
The ASML will be down for periodic preventative maintenance on Jan 29th-Jan31st, please plan your process accordingly.
 
// [[User:John_d|Demis D. John]] 17:00, 11 January 2024 (PST)
 
   
  +
-Lee
=====Gowning Refresh: Jan 23rd=====
 
Beginning Tuesday January 23rd, we will be pulling gowns and booties for refresh. Please remove all personal items from your suits prior to the week your section will be cleared.
 
// [[User:John_d|Demis D. John]] 07:28, 11 January 2024 (PST)
 
   
=====EBeam#1: UP=====
 
EBeam1 is UP.
 
// [[User:John_d|Demis D. John]] 10:07, 17 January 2024 (PST)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:41, 13 May 2024 (PDT)
=====DUV Flood: UP with new procedure=====
 
The new parts have been installed and the tool has been tested.
 
   
  +
=====Velion FIB Tool DOWN=====
We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 4 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on [https://wiki.nanofab.ucsb.edu/wiki/DUV_Flood_Expose#Documentation:~:text=Exposure%20System%20Spectra-,Documentation,-%5Bedit%20%7C its Wiki page].
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
   
// [[User:John_d|Demis D. John]] 17:18, 4 January 2024 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
   
=====Job Opening: Process Engineer=====
+
=====ASML optics replacement May 20th-22nd=====
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
   
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   

Latest revision as of 14:41, 13 May 2024

Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair

I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis

//Vraj Mehalana 13:42, 9 May 2024 (PDT)

MA6 TSA is down - Update

After working with our FSE over the phone, we feel the culprit is a bound up Y axis motor for the top side microscope. Unfortunately, this axis is at the bottom of the microscope assembly and will require the removal of both the X and Z axis sub assemblies. I am awaiting proper instructions on how to dismantle all of this and the FSE is also checking with some of their contacts to see if there is an easier solution.


I have been asked by a few users about using the tool in TSA mode for exposures that do not require alignment even through the topside microscope is not functional. I have just tested the tool in TSA mode and it will work like this, just note that the topside microscope will not come down.

-Lee


//Vraj Mehalana 14:41, 13 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)