Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(removed qhitespac and internal comments (since vraj's script was pushing them to the bottom, instead of top where they used to be for human-readable instructions)))
 
(75 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair=====
=====Job Opening: Process Engineer=====
 
  +
I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:42, 9 May 2024 (PDT)
 
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
  +
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====ASML optics replacement May 20th-22nd=====
  +
We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 09:40, 9 May 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
=====ProbeStation scheduled IT maintenance=====
 
The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting
 
//[[User:Mehalana v|Vraj Mehalana]] 14:29, 3 November 2023 (PDT)
 
 
=====PECVD2 is down=====
 
We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again.
 
//[[User:Mehalana v|Vraj Mehalana]] 16:48, 31 October 2023 (PDT)
 
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.

Latest revision as of 13:42, 9 May 2024

Atomic Force Microscope (Dimension ICON) - 05/08: AFM Head needs repair

I will have to take the AFM head unit back to Bruker for repair. The height sensor failed all the tests I tried so the Z-piezo/strain gauge unit will most likely need to be replaced. SO for the foreseeable future, the AFM is down.--Demis

//Vraj Mehalana 13:42, 9 May 2024 (PDT)

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

ASML optics replacement May 20th-22nd

We will be performing beam delivery optics replacement on Mon May 20th to 22nd, to resolve a low intensity reading. The tool will be unavailable during this time.e.

//Vraj Mehalana 09:40, 9 May 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)