Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML update, system up, software fixed)
 
(267 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
 
=====Velion FIB Tool DOWN=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
<!-- Description of the RSS feed -->
 
'''''Important Announcements'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:18, 23 April 2024 (PDT)
In order for your post to show up correctly, you need to:
 
  +
=====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am=====
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
  +
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
  +
-PECVD # 1
===== ASML Up =====
 
   
  +
-PECVD # 2
System is fully calibrated and ready to use. We are running a newer computer, so we expect there to be some differences.
 
   
  +
-Fluorine ICP
Old jobs have been copied over, software options restored, and all old Jobs can be run/edited without issue.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT)
Nanofiles sync & JobCreator functionality will be restored in the next 2 weeks.
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
// [[User:John d|John d]] 09:44, 28 June 2022 (PDT)
 
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
===== Face-Masks Optional as of June 13 =====
 
You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired.
 
   
  +
=====ICP1 Down=====
We will still provide masks at the metal table in front of the cleanroom entry.
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link].
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Job Opening: Process Engineer=====
See the full policies at '''[[COVID-19_User_Policies]]'''
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
// [[User:John d|John d]] 11:20, 13 June 2022 (PDT)
 
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
===== PureStrip Bath Heater UP =====
 
The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has been replaced, it is ready for use.
 
// [[User:John d|John d]] 08:29, 21 June 2022 (PDT)
 
   
===== Unaxis-Dep: Up =====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
New bottle of Deuterated Silane (SiD4) has been installed, we've qualified the SiO2 process and it looks good. Films are ready to use.
 
// [[User:John d|John d]] 10:11, 17 June 2022 (PDT)
+
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
===== Gasonics Down =====
+
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
Leak in main chamber, tool is down.
 
// [[User:John d|John d]] 14:35, 27 May 2022 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
===== New EBL Rates =====
 
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows:
 
 
In order for your post to show up correctly, you need to:
 
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
Industrial Users: $405/hour
 
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
 
-->
UC Academic Users: $126/hour
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
Non-UC Academic Users: $150/hour
 
 
UCSB CNSI Incubator USers: $260/hour
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
Line 84: Line 64:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 16:18, 23 April 2024

Velion FIB Tool DOWN

Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.

//Vraj Mehalana 16:18, 23 April 2024 (PDT)

Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am

Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day

-PECVD # 1

-PECVD # 2

-Fluorine ICP

//Vraj Mehalana 17:48, 19 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)