Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(AutoStep up.)
 
(57 intermediate revisions by 4 users not shown)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== F50 UP =====
+
===== SEM#1 (FEI): UP =====
The [[Optical_Film_Thickness_%26_Wafer-Mapping_(Filmetrics_F50)|Filmetrics F50 Wafer Mapper]] is repaired and up.
+
The field service engineer has finished with the alignments and the system is ready to use.
 +
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
  
Tool has been relocated to Bay 7, just before the EBL room.
+
===== Stepper #2 (Autostep): UP =====
// [[User:John d|John d]] 07:24, 10 May 2022 (PDT)
+
System up. Please note the maintenance schedule this week. // [[User:John d|John d]] 10:54, 26 September 2022 (PDT)
  
===== F10-RT Down =====
+
===== E-Beam#2: Heater Down =====
The '''[[Optical_Film_Spectra_%2B_Optical_Properties_(Filmetrics_F10-RT-UVX)|Filmetrics F10-RT]]''' is UP!
+
EB2 Heated Processing is down
//[[User:Thibeault|Thibeault]] 10:20, 11 May 2022 (PDT)
+
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
===== LEXT Confocal: DOWN =====
+
===== GCA AutoStep Service =====
LEXT Confocal microscope is UP!
+
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.
//[[User:Thibeault|Thibeault]] 10:20, 11 May 2022 (PDT)
 
  
===== New COVID protocols =====
+
// [[User:John d|John d]] 08:30, 19 September 2022 (PDT)
Please read the linked letter below (on Wiki) regarding masking policy changes, effective Saturday, March 19. 
 
  
The nanofab will follow this policy with masks being optional for everyone in all sections of the facility beginning March 19.
+
===== GCA 6300 Service =====
 +
GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.
  
All users must adhere to the campus policies as outlined in the letter from Chancellor Yang, including testing where required. 
+
// [[User:John d|John d]] 08:33, 19 September 2022 (PDT)
  
Link: [https://t.e2ma.net/message/opq87n/0equghb March 16th 2022- Letter from Office of the Chancellor]
+
===== MLA 150 Service & Software Revision =====
  
See the full policies at '''[[COVID-19_User_Policies]]'''
+
The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th.
// [[User:John d|John d]] 16:08, 21 March 2022 (PDT)
+
// [[User:Sawyer l|L Sawyer]] 13:32, 31 August 2022 (PDT)
  
===== New EBL Rates =====
+
===== ASML Up; Network status =====
Effective Dec.1, 2021, all of our electron beam lithography rates are lowered.  The new rates are as follows:
 
  
Industrial Users: $405/hour
+
Nanofiles sync & JobCreator functionality is in the process of being restored.
 +
Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.
  
UC Academic Users:  $126/hour
+
// [[User:John d|John d]] 01:53, 17 September 2022 (PDT)
 
 
Non-UC Academic Users:  $150/hour
 
 
 
UCSB CNSI Incubator USers:  $260/hour
 
 
 
//[[User:Thibeault|Thibeault]] 12:21, 9 December 2021 (PST)
 
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>

Latest revision as of 10:54, 26 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

Stepper #2 (Autostep): UP

System up. Please note the maintenance schedule this week. // John d 10:54, 26 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

GCA AutoStep Service

Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.

// John d 08:30, 19 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)