Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(slashes on users)
(EB2 heater update)
 
(151 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
'''''Equipment Status'''''
+
'''''Important Announcements'''''
 
----
 
----
 
<!--
 
<!--
Line 8: Line 8:
  
 
In order for your post to show up correctly, you need to:
 
In order for your post to show up correctly, you need to:
Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
+
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
+
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== Lab Closed 5a–7am on 8/26 =====
+
===== ASML: Down on Dec 12th =====
Campus facilities need to fix a gross leak on our compressed air system.  The work is scheduled for Thursday morning (8/26) from 5am to 7am.  During this time no users will be allowed in the lab.
+
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
 +
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
  
An email will go out once the lab is back online.  Please plan accordingly.
+
===== Au Plating: DOWN =====
// [[User:Hopkins a|Hopkins a]] 15:03, 23 August 2021 (PDT)
+
Bath damaged, system is down for repair.  
 +
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
  
===== Building Controls Update next Friday (8/27) =====
+
===== E-Beam#2: Heater UP =====
Campus facilities will be doing a firmware update on the building controls at 7am. No disruption in operation is expected but there is a slight chance of a small change in cleanroom temperature and/or pressure.  Please plan accordingly.
+
We tested the heater to 680°C three times without any issues. There is still the issue with the temp controller not communicating with the software which will get sorted out eventually. In the meantime you will just change the temp using the controller, directions are posted at the tool.
// [[User:Hopkins a|Hopkins a]] 16:52, 19 August 2021 (PDT)
+
// [[User:John d|John d]] 15:55, 6 December 2022 (PST)
  
===== New COVID Protocols =====
+
===== NanoFab Job Openings =====
All facility users and visitors are now required to have masks on while indoors in shared spaces.  This includes shared offices, hallways/corridors, and all shared laboratory spaces.  Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
+
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
 
 
This direction applies to all vaccinated and non-vaccinated persons.
 
 
 
Outdoor policies remain unchanged
 
 
 
Surgical style masks or KN95 masks are appropriate for cleanroom use.  Cloth masks may be used in non-cleanroom spaces.
 
// [[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
 
 
 
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
 
 
Weekly recurring appointments can be made at the Student Health website:
 
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
 
 
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
 
 
===== NanoFab COVID Protocols =====
 
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
 
 
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
  
 +
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 62: Line 40:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
Line 71: Line 49:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 15:55, 6 December 2022

Important Announcements


ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater UP

We tested the heater to 680°C three times without any issues. There is still the issue with the temp controller not communicating with the software which will get sorted out eventually. In the meantime you will just change the temp using the controller, directions are posted at the tool. // John d 15:55, 6 December 2022 (PST)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)