Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ASML Dec 12th Laser PM)
 
(421 intermediate revisions by 6 users not shown)
Line 2: Line 2:
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
<!-- Description of the RSS feed -->
''Equipment Status''
+
'''''Important Announcements'''''
 +
----
 
<!--
 
<!--
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
+
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 +
 
 +
In order for your post to show up correctly, you need to:
 +
>> Use FIVE equal-signs for the Title's heading level.  eg.: ===== my post =====
 +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
  
===== Suss Bonder =====
+
===== MA6: service 11/30 =====
The system is down. We are waiting for fieldservce.
+
The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed.
[[User:Silva|Silva]] 10:18, 4 February 2019 (PST)
+
// [[User:John d|John d]] 08:26, 20 November 2022 (PST)
 
 
===== KLA Tencor Surfscan =====
 
The system is down. We are sourcing a replacement PCB.
 
[[User:Silva|Silva]] 10:20, 4 February 2019 (PST)
 
  
===== ALD Metal Dep =====
+
===== ASML: Down on Dec 12th =====
The system is down. The lead time for the replacement turbo pump is three weeks.
+
On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser.
[[User:Silva|Silva]] 10:44, 4 February 2019 (PST)
+
// [[User:John d|John d]] 16:47, 28 November 2022 (PST)
  
===== E-Beam#1 =====
+
===== Au Plating: DOWN =====
We will start the power supply upgrade Monday morning February 11, 2019. We are planning on 10 working days to complete the retrofit. All users will need to be trained on the new control system.  
+
Bath damaged, system is down for repair.  
[[User:Silva|Silva]] 08:35, 6 February 2019 (PST)
+
// [[User:John d|John d]] 08:48, 27 October 2022 (PDT)
  
===== Advanced Vacuum PECVD#2 =====
+
===== E-Beam#2: Heater Down =====
The system is down. There is a large vacuum leak in the main chamber. I must cool the chuck down to inspect the assembly. The system will be down until tomorrow afternoon.
+
EB2 Heated Processing is down
[[User:Silva|Silva]] 16:09, 6 February 2019 (PST)
+
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
  
 +
===== NanoFab Job Openings =====
 +
The NanoFab has current job openings, apply at: [https://wiki.nanotech.ucsb.edu/wiki/Nanofab_Job_Postings '''NanoFab Job Postings''']
  
 +
// [[User:John d|John d]] 23:55, 4 October 2022 (PDT)
  
 
<!---------- end of Equipment Status ------------>
 
<!---------- end of Equipment Status ------------>
Line 40: Line 44:
  
  
====== HOW TO ADD NEWS ITEMS ======
+
====== HOW TO ADD ITEMS ======
  
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
Line 49: Line 53:
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  
  

Latest revision as of 16:47, 28 November 2022

Important Announcements


MA6: service 11/30

The MA6 will be unavailable on Wednesday 11/30 beginning around 7:15 am until around 5 pm. We'll send out an email that day once the service is completed. // John d 08:26, 20 November 2022 (PST)

ASML: Down on Dec 12th

On Dec 12th the system will be down for half a day, so we can perform periodic maintenance (PM) on the DUV Laser. // John d 16:47, 28 November 2022 (PST)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)