=====MA6 TSA is down - Update=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR INSTRUCTIONS ON ADDING NEWS ITEMS.
 
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
===== LAB CLOSED Monday 7:30a-8:30a =====
 
  +
=====Velion FIB Tool DOWN=====
EH & S will be conducting their annual fire alarm test and evacuation drill on Monday at 7:30am. Cleanroom and building exhaust could potentially go down so users will not be allowed in the lab from 7:30 to 8:30am. We will send out an email once the lab is safe to re-enter.
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
// [[User:John d|John d]] 16:26, 14 September 2018 (PDT)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
===== EBeam #2: Scheduled Maintenance =====
 
On Monday the 17th, EB2 will be down all day for modifications. If possible we will have the system up and running by the end of the day either in it's modified form or as it is now. Please plan accordingly
 
// [[User:John d|John d]] 17:13, 12 September 2018 (PDT)
 
   
===== RIE#5: Software Upgrades =====
+
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
[[RIE_5_(PlasmaTherm)|RIE#5]] Will be down next week from approximately Monday Sept. 17th to Thursday Sept. 20th, for a software upgrade to the same software running on the other PlasmaTherm tools.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
All users will need to be retrained after the upgrade is complete.
 
// [[User:John d|John d]] 15:16, 11 September 2018 (PDT)
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
===== PECVD#1: Software Upgrade =====
 
Plasmatherm will be upgrading the system software on September 17th. The upgrade will take 3-5 days. After the upgrade is complete, everyone must be re-certified to use the tool. Please document any custom recipes that you may have, in case they can't be copied over.
 
// [[User:John d|John d]] 06:38, 15 August 2018 (PDT)
 
   
===== RIE#5: SiCl4 Issue =====
+
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min.
 
// [[User:John d|John d]] 17:22, 15 June 2018 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
<!---------- end of announcements ------------>
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
<!---------------------------------------------->
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
  +
* You can copy/paste the example below for a new news item.
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 52: Line 53:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
(end of example)
+
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)