Difference between revisions of "Template:Announcements"
(pecvd 2 title) |
Mehalana v (talk | contribs) |
||
(773 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====MA6 TSA is down - Update===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something. |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
⚫ | |||
⚫ | |||
+ | =====Velion FIB Tool DOWN===== |
||
⚫ | |||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | Example of a new post: |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | // ~~~~ |
||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
− | (end of example) |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
⚫ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!--------- |
+ | <!---------DO NOT EDIT BELOW THIS LINE-----------> |
⚫ | |||
⚫ | |||
⚫ | |||
− | ===== Stepper #2 AutoStep: UP ===== |
||
⚫ | |||
− | One RMS motor and motor control board was replaced. I ran setup |
||
+ | ====== HOW TO ADD ITEMS ====== |
||
− | without error. The system is up and ready for your use. |
||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
− | ===== PECVD#2: Down, Retraining required ===== |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
− | The Plasma Therm Cortex software update is complete, and the system is operational. We still have some work to do before we start training users. We need to check particulate counts, and we need to qualify all the standard process recipes. |
||
− | If everything goes well with particulates, and film quality, we will start training sessions early next week. |
||
⚫ | |||
− | ===== RIE#5 Up, SiCl4 unavailable ===== |
||
− | The SiCl4 gas line is down until next week when we can change the gas |
||
− | panel. |
||
⚫ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
⚫ | |||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
⚫ | |||
⚫ | |||
− | <!---------- end of announcements ------------> |
||
⚫ | |||
⚫ | |||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
⚫ | |||
+ | |||
⚫ | |||
+ | ************* (end of example) ************** |
||
⚫ | |||
⚫ |
Latest revision as of 11:15, 1 May 2024
MA6 TSA is down - Update
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
//Vraj Mehalana 11:15, 1 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)