=====Velion FIB Tool DOWN=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
'''How to add new news items'''
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:18, 23 April 2024 (PDT)
* Use level 5 heading for each item (5 equal signs) - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
  +
=====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am=====
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
  +
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* "There are no announcements at this time." should be used when empty.
 
   
  +
-PECVD # 1
   
  +
-PECVD # 2
Example of a new post:
 
   
  +
-Fluorine ICP
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// ~~~~
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
(end of example)
 
  +
We are postponing the Maintenance date to May 6th – 10th.
The ~~~~ will be replaced with your username & timestamp after you submit the post.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
-->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
===== PECVD#2 Upgrade, Retraining required =====
 
Plasmatherm will be here Monday April 16, 2018 to upgrade the system
 
software. The user interface will be completely different from what it
 
is now. All users will be disqualified and will need to be retrained
 
to access the system through Signupmonkey. We will schedule training
 
sessions for the middle of next week.
 
// [[User:John d|John d]] 17:53, 13 April 2018 (PDT)
 
   
===== RIE#5 Up =====
+
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
RIE #5 is up for use, including SiCl4.
 
// [[User:John d|John d]] 11:45, 20 April 2018 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
===== ADT Dicing Saw: Intermittent Software Issue =====
+
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it.
 
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT)
 
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
===== EBeam #4: Re-Training Required =====
 
The upgrade is complete and working well. All users will be required
 
to be trained again. The high voltage, sweep and turret controls are
 
all new.
 
// [[User:John d|John d]] 12:13, 26 March 2018 (PDT)
 
   
===== Cary 500 Down =====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
+
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
  +
=====Wafer Bonder, (Suss SB6-8E)=====
<!---------- end of announcements ------------>
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
<!---------------------------------------------->
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
  +
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
  +
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
  +
  +
  +
******** EXAMPLE OF A NEW POST ********
  +
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  +
  +
************* (end of example) **************
 
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->

Latest revision as of 16:18, 23 April 2024

Velion FIB Tool DOWN

Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.

//Vraj Mehalana 16:18, 23 April 2024 (PDT)

Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am

Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day

-PECVD # 1

-PECVD # 2

-Fluorine ICP

//Vraj Mehalana 17:48, 19 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)