Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(ibd removed, bluem fuse blown)
 
(787 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====MA6 TSA is down - Update=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
'''How to add new news items'''
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
* Use level 5 heading for each item (5 equal signs) - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
 
=====Velion FIB Tool DOWN=====
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* "There are no announcements at this time." should be used when empty.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
Example of a new post:
 
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// ~~~~
 
   
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Lab Access Changes: Symmetry App=====
(end of example)
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
The ~~~~ will be replaced with your username & timestamp after you submit the post.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
  +
In order for your post to show up correctly, you need to:
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
+
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
<!------------- Announcements ---------------->
 
 
<noinclude>[[Category:Templates]]</noinclude>
===== BlueM Oven: Down for day =====
 
 
<!--------------------------------------------
We suspect the oven has blown a fuse. We expect to address the issue
 
  +
====== HOW TO ADD ITEMS ======
tomorrow.
 
  +
* You can copy/paste the example below for a new news item.
// [[User:John d|John d]] 09:26, 5 April 2018 (PDT)
 
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
===== ICP#2 Up =====
 
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
RF travelling wave error unable to be reproduced, recipes appear to run fine.
 
// [[User:John d|John d]] 10:21, 2 April 2018 (PDT)
 
   
===== ADT Dicing Saw: Intermittent Software Issue =====
 
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it.
 
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT)
 
   
  +
******** EXAMPLE OF A NEW POST ********
===== EBeam #4: Re-Training Required =====
 
The upgrade is complete and working well. All users will be required
 
to be trained again. The high voltage, sweep and turret controls are
 
all new.
 
// [[User:John d|John d]] 12:13, 26 March 2018 (PDT)
 
   
===== PECVD #2: UP with possible High Particulates =====
+
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
We are still experiencing high particle counts in the Advanced Vacuum
 
 
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
PECVD process. Our next step is to replace the Silane MFC. I will
 
update you once I have a lead time on the new MFC. Most likely it will
 
take several weeks to receive. Until then, the system is operational
 
and can be used if your process is not sensitive to high particle
 
counts.
 
// [[User:John d|Posted:]] 13:22, 19 March 2018 (PDT)
 
   
  +
************* (end of example) **************
===== Gasonics: Up =====
 
 
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
 
---------------------------------------------->
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
 
===== Cary 500 Down =====
 
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
 
 
<!---------- end of announcements ------------>
 
<!---------------------------------------------->
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 

Latest revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)