+ | =====MA6 TSA is down - Update===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something. |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
⚫ | |||
⚫ | |||
+ | =====Velion FIB Tool DOWN===== |
||
⚫ | |||
+ | Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | ===== EBeam #4: Down for Upgrades ===== |
||
− | Down through the week of Monday the 12th, installing new HV/Sweep controller. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT) |
||
− | Users will need retraining on these new components once the system is back up. |
||
⚫ | |||
− | ===== |
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
− | We found an issue that most likely contributed to the high particle |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
− | count. We will verify the particle count on Monday. Until then, I will |
||
− | release the system for use, but please assume the particle count is |
||
− | still high if running the tool before further notice. I will send out |
||
− | an email with the updated particle count Monday afternoon. |
||
− | // [[User:John d|Posted:]] 17:24, 16 March 2018 (PDT) |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT) |
||
− | ===== Stepper #2 Maintenance ===== |
||
− | The vendor will be servicing the GCA Autostep on Thursday March 15, 2018 at 8:00AM. The system will be up and running later that afternoon. Please plan your process accordingly. |
||
⚫ | |||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | 3C is finished with the maintenance on the 6300 and the system is |
||
⚫ | |||
− | ready to use. Please let us know immediately if you encounter any |
||
− | issues. |
||
⚫ | |||
− | ===== |
+ | =====Lab Access Changes: Symmetry App===== |
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. |
||
− | // [[User:John d| |
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
− | ===== |
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
⚫ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
− | <!----------------------------------------------> |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
+ | ====== HOW TO ADD ITEMS ====== |
||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
⚫ |
Latest revision as of 11:15, 1 May 2024
MA6 TSA is down - Update
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
//Vraj Mehalana 11:15, 1 May 2024 (PDT)
Velion FIB Tool DOWN
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
//Vraj Mehalana 10:58, 30 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)