=====PECVD2: maintenance on Monday Oct 23=====
+
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
We will be taking the system back down on Monday to evaluate the hoist.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 08:03, 20 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
=====ProbeStation scheduled IT maintenance=====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
 
* 10-30-23
 
* 10-31-23
 
Please plan your work activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
=====PECVD2 Planned Down Time for Maintenance 10-19-23=====
 
PECVD2 will be going down on Thursday October 19th for replacement of the hoist.
 
This will be an all day event starting at 8:00am.
 
Please plan accordingly.
 
This was originally planned for 10-2, but we had to reschedule due to other equipment down
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
//[[User:Mehalana v|Vraj Mehalana]] 15:18, 12 October 2023 (PDT)
 
  +
We are postponing the Maintenance date to May 6th – 10th.
=====Raith Velion - Tool Up=====
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
The y-axis motor has been replaced and the stage is working well now. Tests overnight have been completed with excellent results. I'll check the source and column alignment this morning, the tool will be available from 10am.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
- Dan
 
   
 
=====ICP1 Down=====
//[[User:Mehalana v|Vraj Mehalana]] 10:12, 13 October 2023 (PDT)
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
=====Unaxis ICP-PECVD is UP for Non-GapFill=====
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available.
 
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run.
 
Please plan your process accordingly.
 
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed.
 
   
  +
=====Lab Access Changes: Symmetry App=====
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
 
===== Dicing Saw Upgrade - Update=====
 
The upgrade work on the saw is completed. My plan is to work on updating the SOP and running some more tests tomorrow and Monday. If all goes smoothly I should be ready to start re-training users on Tuesday, so I should be sending out an email some time Monday in regard to the re-training schedule.
 
 
-Lee
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT)
 
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT)
 
 
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times:
 
(1) 09-30-23 8:00am-5:00pm
 
(2) 10-01-23 8:00am-5:00pm
 
(3) 10-02-23 8:00am-12:00pm
 
Please plan your work activities accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT)
 
 
===== EVG is down=====
 
EVG finally has our PO. They are scheduled to be here next week, my guess would be Tuesday.
 
 
-Lee
 
 
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 18 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 69: Line 33:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)