Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Feed Appended)
(116 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Dicing Saw (ADT) Upgrade 10/9 - PLEASE READ
+
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
=====
 
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 
 
=====Velion FIB Tool DOWN=====
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
=====SEM 2 is Up=====
 
JEOL has finished will the install and the SEM is available to use if you've received training on SEM #1.
 
[[User:Hopkins a|Hopkins a]] 15:32, 29 August 2023 (PDT)
 
   
=====Plasma Activation (EVG 810)=====
+
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
Runs will still require Staff supervision until then.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
  +
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
 
<!--
Line 25: Line 33:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)