Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Feed Appended)
(146 intermediate revisions by 6 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Flip-Chip Bonder, (Finetech) - Update=====
+
=====MA6 TSA is down - Update=====
  +
Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.
Finetech is expected to be on-site at the end of next week. I'm sorry for the delay but that's the earliest they can get here.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:35, 3 May 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:15, 1 May 2024 (PDT)
=====Plasma Activation (EVG 810)=====
 
  +
=====Velion FIB Tool DOWN=====
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
  +
Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 30 April 2024 (PDT)
  +
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
  +
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
  +
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
Runs will still require Staff supervision until then.
 
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
 
=====E-Beam #4 (CHA) - EB4 is down=====
 
We need to replace a part on the source shutter. We should have it on Monday. I'll update when the tool is available.
 
//[[User:Mehalana v|Vraj Mehalana]] 15:26, 28 April 2023 (PDT)
 
=====Wafer Coater (S Cubed Flexi) - S3 field service=====
 
S3 will be on-site looking into our hand 2 issues on Wednesday May 3rd and 4th. They will be confirming Monday so there is a chance those days get shifted. Please plan your processing accordingly as the system will not be available while they are here looking into the problem.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:54, 28 April 2023 (PDT)
 
=====FEI SEM#1 Replacement Project=====
 
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
 
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
<!-- Description of the RSS feed -->
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 25: Line 33:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 11:15, 1 May 2024

MA6 TSA is down - Update

Still waiting on a quote and lead time for the board we need for the TSA microscope issue, was supposed to have that info yesterday. I've just pinged them and will provide everyone with an update once I have something.

//Vraj Mehalana 11:15, 1 May 2024 (PDT)

Velion FIB Tool DOWN

Raith service are installing and aligning a new GaBiLi source. The Velion FIB column is not available to users until further notice.

//Vraj Mehalana 10:58, 30 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)