Difference between revisions of "Template:Announcements"
(DSEiii clasp broke) |
Mehalana v (talk | contribs) |
||
(697 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Velion FIB Tool DOWN===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Announcements ----------------> |
||
⚫ | |||
− | ===== DSE-iii Down ===== |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | The clamp broke. The system is down until we come up with a game plan. |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
⚫ | |||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
⚫ | |||
− | ===== ASML Maintenance ===== |
||
− | ASML is here performing annual maintenance through Thursday mid-day at least, possibly through Friday. |
||
⚫ | |||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | We are going to upgrade the computer and software on PECVD#1 in 2–3 weeks. The tool will be down for three to five days. Once the upgrade is complete, everyone will need to be retrained on the new software. You should start planning accordingly, if you use this tool. We will send out an email when we know the exact dates. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | We have a flow rate problem on the SiCl4 gas line. You can only flow the SiCl4 for 5 minutes and then you have to wait 5 minutes before you flow it again. So in order to to do a 10 minute Etch you will have to do it in three steps flow 5 mi, wait 5mi, then flow 5min. |
||
⚫ | |||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
− | <!---------- end of announcements ------------> |
||
+ | |||
− | <!----------------------------------------------> |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
⚫ | |||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
+ | * You can copy/paste the example below for a new news item. |
||
− | |||
− | |||
− | |||
⚫ | |||
− | |||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
Line 47: | Line 53: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
− | (end of example) |
+ | ************* (end of example) ************** |
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 10:58, 30 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)