Difference between revisions of "Template:Announcements"
m (→EBeam #4: Re-Training needed: needed --> required) |
Mehalana v (talk | contribs) |
||
(797 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Velion FIB Tool DOWN===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
− | <!-- Description of the RSS feed --> |
||
− | ''UCSB NanoFab Announcements'' |
||
⚫ | |||
− | '''How to add new news items''' |
||
⚫ | |||
⚫ | |||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
⚫ | |||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
⚫ | |||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | Software fix by restoring from backup. If you created a new recipe within the last 5 days you may need to re-create it. |
||
⚫ | |||
⚫ | |||
− | ===== EBeam #4: Re-Training Required ===== |
||
− | The upgrade is complete and working well. All users will be required |
||
− | to be trained again. The high voltage, sweep and turret controls are |
||
− | all new. |
||
⚫ | |||
⚫ | |||
− | ===== PECVD #2: UP with possible High Particulates ===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | We are still experiencing high particle counts in the Advanced Vacuum |
||
⚫ | |||
− | PECVD process. Our next step is to replace the Silane MFC. I will |
||
− | update you once I have a lead time on the new MFC. Most likely it will |
||
− | take several weeks to receive. Until then, the system is operational |
||
− | and can be used if your process is not sensitive to high particle |
||
− | counts. |
||
⚫ | |||
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. |
||
⚫ | |||
+ | =====Lab Access Changes: Symmetry App===== |
||
⚫ | |||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | <!----------------------------------------------> |
||
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
+ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
+ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
⚫ | |||
⚫ | |||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | |||
+ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | |||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | |||
+ | ************* (end of example) ************** |
||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
⚫ |
Revision as of 10:58, 30 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)