Difference between revisions of "Template:Announcements"
m (deleted GCS stepper update) |
Mehalana v (talk | contribs) |
||
(874 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
− | <feedBurner name="UCSBNanofab-Announcements" /> |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
⚫ | |||
− | '''How to add new news items''' |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 16:18, 23 April 2024 (PDT) |
||
⚫ | |||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
⚫ | |||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
⚫ | |||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT) |
||
− | ===== Holiday Closures ===== |
||
− | // The Nanofab will be closed on Thursday, 12/28 and Friday 12/29 for lab maintenance. No one will be allowed into the lab during these days. |
||
+ | =====ICP1 Down===== |
||
− | // The official staff holiday schedule is on Monday, 12/25 and Tuesday, 12/26. The lab will still be open for use during these off days, but staff will not be here to help. |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Job Opening: Process Engineer===== |
||
⚫ | |||
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
− | ===== |
+ | =====Lab Access Changes: Symmetry App===== |
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | // The NanoFab is Open. |
||
⚫ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
− | // The [http://countyofsb.org/thomasfire.sbc Thomas Fire] has caused repeated power outages since the evening of Monday 12/4. CalFire is posting updates on [http://www.fire.ca.gov/current_incidents/incidentdetails/Index/1922 their webpage] and [https://www.facebook.com/CALFIRE FaceBook page]. |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
+ | In order for your post to show up correctly, you need to: |
||
+ | >> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post ===== |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
+ | ====== HOW TO ADD ITEMS ====== |
||
+ | * You can copy/paste the example below for a new news item. |
||
⚫ | |||
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
||
⚫ | |||
− | UV-Vis Detector Failure. Locating replacement. |
||
⚫ | |||
+ | ******** EXAMPLE OF A NEW POST ******** |
||
+ | ===== NanoFab making LN2 icecream ===== |
||
+ | Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
+ | ************* (end of example) ************** |
||
⚫ | |||
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
||
− | <!----------------------------------------------> |
||
⚫ | |||
⚫ | |||
⚫ |
Revision as of 10:58, 30 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)