Difference between revisions of "Template:Announcements"
Mehalana v (talk | contribs) |
Mehalana v (talk | contribs) |
||
(73 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Velion FIB Tool DOWN===== |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
⚫ | |||
⚫ | |||
+ | =====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am===== |
||
⚫ | |||
+ | Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day |
||
⚫ | |||
+ | -PECVD # 1 |
||
⚫ | |||
− | Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure. |
||
+ | -PECVD # 2 |
||
⚫ | |||
− | =====ProbeStation scheduled IT maintenance===== |
||
− | The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates : |
||
− | * 10-30-23 |
||
− | * 10-31-23 |
||
− | * 11-01-23 |
||
− | * 11-02-23 |
||
− | Please plan your work activities accordingly. |
||
+ | -Fluorine ICP |
||
− | //[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT) |
||
⚫ | |||
− | =====PECVD2 is UP===== |
||
− | We were able to fix the vacuum leak but unfortunately the particulates are off the chart and rate is still a bit low. Tomorrow morning we will be taking the showerhead apart and cleaning it up before testing again. |
||
⚫ | |||
− | =====Unaxis VLR - GapFill allowed Mon 30th 5pm to Wed 6am===== |
||
− | We are still working on an improved GapFill recipe. |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run, |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
⚫ | |||
− | - starting Monday Oct 30th, evening at 5pm, |
||
⚫ | |||
− | - ending Wed Nov 1st, morning at 6am. |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
⚫ | |||
− | Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME. |
||
⚫ | |||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
− | Let me know if you have any questions. |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
⚫ | |||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
− | + | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|
⚫ | |||
⚫ | |||
− | |||
− | =====EVG Activation: Up===== |
||
− | The FSE has completed the work on the tool and I have made several test runs without issue. |
||
− | |||
− | IMPORTANT - Please see corresponding email for changes in operation. |
||
− | |||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
||
Line 54: | Line 44: | ||
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
--> |
--> |
||
− | <!----------------------------------------------> |
||
− | <!------------- Equipment Status ----------------> |
||
− | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
<!---------DO NOT EDIT BELOW THIS LINE-----------> |
||
<endfeed /> |
<endfeed /> |
Revision as of 16:18, 23 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
-PECVD # 1
-PECVD # 2
-Fluorine ICP
//Vraj Mehalana 17:48, 19 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)