=====Velion FIB Tool DOWN=====
  +
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 16:18, 23 April 2024 (PDT)
=====EBeam2 UP=====
 
  +
=====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am=====
Test run completed without issue. System is ready to use, EXCEPT for heater - contact supervisor for heater use. See email for updates to operating procedure.
 
  +
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
   
  +
-PECVD # 1
//[[User:Mehalana v|Vraj Mehalana]] 11:48, 26 October 2023 (PDT)
 
=====ProbeStation scheduled IT maintenance=====
 
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
 
* 10-30-23
 
* 10-31-23
 
Please plan your work activities accordingly.
 
   
  +
-PECVD # 2
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT)
 
   
  +
-Fluorine ICP
=====PECVD2 is UP=====
 
Initially it was planned to remove the hoist again to rebuild it to solve the leak.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT)
The manufacturer is sending out a rebuild kit under warranty since it is a brand new hoist that is leaking.
 
When that arrives I will schedule another all day event to rebuild the hoist.
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
I cleaned up the leaked oil, checked oil level, and did an inspection of the tool.
 
  +
We are postponing the Maintenance date to May 6th – 10th.
System is back up and available for use.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
//[[User:Mehalana v|Vraj Mehalana]] 11:11, 23 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
=====Unaxis ICP-PECVD is UP for Non-GapFill=====
 
We are still working on an improved GapFill recipe.
 
   
 
=====ICP1 Down=====
To allow your processes through, on Monday EVENING at 5pm we will allow the old "450W GapFill" recipe to be run,
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Job Opening: Process Engineer=====
- starting Monday Oct 30th, evening at 5pm,
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
- ending Wed Nov 1st, morning at 6am.
 
   
  +
=====Lab Access Changes: Symmetry App=====
Reminder: You may NOT run the 450W recipe outside these allowed times, and you may Not modify our recipes apart from Dep/Clean TIME.
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
Let me know if you have any questions.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
 
=====EVG Activation: Up=====
 
The FSE has completed the work on the tool and I have made several test runs without issue.
 
 
IMPORTANT - Please see corresponding email for changes in operation.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 55: Line 44:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 16:18, 23 April 2024

Velion FIB Tool DOWN

Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.

//Vraj Mehalana 16:18, 23 April 2024 (PDT)

Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am

Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day

-PECVD # 1

-PECVD # 2

-Fluorine ICP

//Vraj Mehalana 17:48, 19 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)