Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Feed Appended)
(84 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====PECVD2: maintenance on Monday Oct 23=====
+
=====Velion FIB Tool DOWN=====
  +
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
We will be taking the system back down on Monday to evaluate the hoist.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 08:03, 20 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 16:18, 23 April 2024 (PDT)
  +
=====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am=====
=====ProbeStation scheduled IT maintenance=====
 
  +
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
 
* 10-30-23
 
* 10-31-23
 
Please plan your work activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT)
 
   
  +
-PECVD # 1
=====PECVD2 Planned Down Time for Maintenance 10-19-23=====
 
PECVD2 will be going down on Thursday October 19th for replacement of the hoist.
 
This will be an all day event starting at 8:00am.
 
Please plan accordingly.
 
This was originally planned for 10-2, but we had to reschedule due to other equipment down
 
   
  +
-PECVD # 2
//[[User:Mehalana v|Vraj Mehalana]] 15:18, 12 October 2023 (PDT)
 
=====Raith Velion - Tool Up=====
 
The y-axis motor has been replaced and the stage is working well now. Tests overnight have been completed with excellent results. I'll check the source and column alignment this morning, the tool will be available from 10am.
 
   
  +
-Fluorine ICP
- Dan
 
   
//[[User:Mehalana v|Vraj Mehalana]] 10:12, 13 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT)
=====Unaxis ICP-PECVD is UP for Non-GapFill=====
 
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available.
 
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run.
 
Please plan your process accordingly.
 
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed.
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
=====Wafer Bonder, (Suss SB6-8E)=====
 
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
 
=====ICP1 Down=====
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
===== Dicing Saw Upgrade - Update=====
+
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
The upgrade work on the saw is completed. My plan is to work on updating the SOP and running some more tests tomorrow and Monday. If all goes smoothly I should be ready to start re-training users on Tuesday, so I should be sending out an email some time Monday in regard to the re-training schedule.
 
   
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
-Lee
 
   
  +
=====Lab Access Changes: Symmetry App=====
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT)
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date.
 
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT)
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times:
 
(1) 09-30-23 8:00am-5:00pm
 
(2) 10-01-23 8:00am-5:00pm
 
(3) 10-02-23 8:00am-12:00pm
 
Please plan your work activities accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT)
 
 
===== EVG is down=====
 
EVG finally has our PO. They are scheduled to be here next week, my guess would be Tuesday.
 
 
-Lee
 
 
//[[User:Mehalana v|Vraj Mehalana]] 10:37, 18 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 69: Line 44:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 16:18, 23 April 2024

Velion FIB Tool DOWN

Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.

//Vraj Mehalana 16:18, 23 April 2024 (PDT)

Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am

Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day

-PECVD # 1

-PECVD # 2

-Fluorine ICP

//Vraj Mehalana 17:48, 19 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)