Difference between revisions of "Template:Announcements"
(asml and unaxis updates) |
Mehalana v (talk | contribs) |
||
(277 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
⚫ | |||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
− | <!-- Description of the RSS feed --> |
||
− | '''''Important Announcements''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | =====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am===== |
||
⚫ | |||
+ | Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Equipment Status ----------------> |
||
+ | -PECVD # 1 |
||
− | ===== Unaxis-Dep: Qualifying ===== |
||
− | New bottle of Deuterated Silane (SiD4) has been installed, we are running process qualifications. |
||
⚫ | |||
+ | -PECVD # 2 |
||
⚫ | |||
− | We don't yet have a tracking number for the Hardware delivery, so it's possible it does not arrive tomorrow (due to supply chain problems). We are expecting to have ASML engineers on-site next week to begin some of the repairs. Tool will be down into next week at least, depending on the hardware delivery schedule. We have possibly repaired two of the failures that required new hardware - will verify next week when ASML engineers are on-site. |
||
⚫ | |||
+ | -Fluorine ICP |
||
− | ===== Masks Optional as of June 13 ===== |
||
− | You are not required to wear a mask in UC buildings at this time. You are also not required to wear a mask in the Nanofab if desired. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT) |
||
− | We will still provide masks at the metal table in front of the cleanroom entry. |
||
− | See the [https://t.e2ma.net/webview/be2nag/25634e9f535619ce1f4eb976598e7268 UCSB announcement at this link]. |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | See the full policies at '''[[COVID-19_User_Policies]]''' |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
− | // [[User:John d|John d]] 11:20, 13 June 2022 (PDT) |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT) |
||
− | ===== PureStrip Bath Heater DOWN ===== |
||
− | The temperature controller on the PureStrip vertical bath in Bay 4 acid bench has failed, do not attempt to use until we replace it. |
||
⚫ | |||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | Leak in main chamber, tool is down. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | Effective Dec.1, 2021, all of our electron beam lithography rates are lowered. The new rates are as follows: |
||
⚫ | |||
− | Industrial Users: $405/hour |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
− | UC Academic Users: $126/hour |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
− | Non-UC Academic Users: $150/hour |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
⚫ | |||
− | UCSB CNSI Incubator USers: $260/hour |
||
⚫ | |||
− | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | |||
⚫ | |||
− | <!---------- end of Equipment Status ------------> |
||
⚫ | |||
− | <!----------------------------------------------> |
||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
− | |||
− | |||
− | |||
⚫ | |||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 78: | Line 64: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 16:18, 23 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
-PECVD # 1
-PECVD # 2
-Fluorine ICP
//Vraj Mehalana 17:48, 19 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)