Difference between revisions of "Template:Announcements"
(deleted ASML 4/26, added HIMT 4/29) |
Mehalana v (talk | contribs) |
||
(384 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Velion FIB Tool DOWN===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present. |
||
− | <!-- Description of the RSS feed --> |
||
− | '''''Equipment Status''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
+ | =====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am===== |
||
⚫ | |||
+ | Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day |
||
⚫ | |||
⚫ | |||
− | <!------------- Equipment Status ----------------> |
||
+ | -PECVD # 1 |
||
− | ===== MLA150 Service: Wed Apr 29th ===== |
||
− | A HIMT Engineer will be here on Thurs Apr. 29th to continue working on the focus issues. Wed reservations may be cancelled to allow for the service visit. |
||
⚫ | |||
+ | -PECVD # 2 |
||
⚫ | |||
− | ASML Engineers will be servicing Stepper #3 from Monday May 17th to Friday May 21st, for a full hose-replacement service. The Tool will be unavailable during this whole time, please plan your fabrication accordingly. |
||
+ | -Fluorine ICP |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT) |
||
− | ===== Weekly Testing strongly urged for UCSB Students/Staff ===== |
||
− | Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge. |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | Weekly recurring appointments can be made at the Student Health website: |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
− | * Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password. |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT) |
||
− | The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here]. |
||
⚫ | |||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
+ | =====Job Opening: Process Engineer===== |
||
− | Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
⚫ | |||
− | ''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.'' |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
⚫ | |||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
⚫ | |||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
⚫ | |||
− | <!---------- end of Equipment Status ------------> |
||
⚫ | |||
− | <!----------------------------------------------> |
||
+ | In order for your post to show up correctly, you need to: |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
− | |||
− | |||
− | |||
− | ====== HOW TO ADD NEWS ITEMS ====== |
||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
− | * URL to the RSS feed via FeedBurner (for Samsung display): http:// |
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
− | * URL to the RSS feed directly from Wiki: https:// |
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
Line 67: | Line 64: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 16:18, 23 April 2024
Velion FIB Tool DOWN
Raith service are investigating an anomalously low beam current. The Velion FIB column is not available to users at present.
//Vraj Mehalana 16:18, 23 April 2024 (PDT)
Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
-PECVD # 1
-PECVD # 2
-Fluorine ICP
//Vraj Mehalana 17:48, 19 April 2024 (PDT)
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)