Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(PECVD#2 retraining, 90°C Hotplate down)
(778 intermediate revisions by 8 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day
<!-- Description of the RSS feed -->
 
''UCSB NanoFab Announcements''
 
<!--
 
'''How to add new news items'''
 
   
  +
-PECVD # 1
* Use level 5 heading for each item (5 equal signs) - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
 
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* "There are no announcements at this time." should be used when empty.
 
   
  +
-PECVD # 2
   
  +
-Fluorine ICP
Example of a new post:
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 17:48, 19 April 2024 (PDT)
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
// ~~~~
 
   
  +
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
(end of example)
 
The ~~~~ will be replaced with your username & timestamp after you submit the post.
 
   
  +
=====ICP1 Down=====
-->
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
<!---------------------------------------------->
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
<!------------- Announcements ---------------->
 
===== PECVD#2 Upgrade, Retraining required =====
 
Plasmatherm will be here Monday April 16, 2018 to upgrade the system
 
software. The user interface will be completely different from what it
 
is now. All users will be disqualified and will need to be retrained
 
to access the system through Signupmonkey. We will schedule training
 
sessions for the middle of next week.
 
// [[User:John d|John d]] 17:53, 13 April 2018 (PDT)
 
   
===== 90°C Hotplate Down =====
+
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
90°C hotplate is down, Do not use! Reads 90C but is actually 160C.
 
// [[User:John d|John d]] 17:53, 13 April 2018 (PDT)
 
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
===== RIE#5 Down Thurs 4/19 =====
 
RIE #5 will be down al day next Thursday 4/19/18 so that we can work
 
on the SiCl4 gas line. We are going to install a new MFC and some
 
other components and we need a long time to pump and purge the line.
 
// [[User:John d|John d]] 13:48, 12 April 2018 (PDT)
 
   
===== ADT Dicing Saw: Intermittent Software Issue =====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it.
 
// [[User:John d|John d]] 21:43, 27 March 2018 (PDT)
+
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
===== EBeam #4: Re-Training Required =====
+
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
The upgrade is complete and working well. All users will be required
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
to be trained again. The high voltage, sweep and turret controls are
 
all new.
 
// [[User:John d|John d]] 12:13, 26 March 2018 (PDT)
 
   
  +
<!--
===== PECVD #2: UP with possible High Particulates =====
 
  +
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
We are still experiencing high particle counts in the Advanced Vacuum
 
  +
In order for your post to show up correctly, you need to:
PECVD process. Our next step is to replace the Silane MFC. I will
 
  +
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
update you once I have a lead time on the new MFC. Most likely it will
 
  +
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
take several weeks to receive. Until then, the system is operational
 
  +
-->
and can be used if your process is not sensitive to high particle
 
  +
<!---------DO NOT EDIT BELOW THIS LINE----------->
counts.
 
  +
<endfeed />
// [[User:John d|Posted:]] 13:22, 19 March 2018 (PDT)
 
  +
<noinclude>[[Category:Templates]]</noinclude>
  +
<!--------------------------------------------
  +
====== HOW TO ADD ITEMS ======
  +
* You can copy/paste the example below for a new news item.
  +
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
  +
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
  +
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
  +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
  +
* Please use "There are no announcements at this time." if the announcements are empty.
   
  +
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
===== Gasonics: Up =====
 
  +
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
   
===== Cary 500 Down =====
 
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options.
 
// [[User:John d|Posted:]] 13:47, 12 February 2018 (PST)
 
   
  +
******** EXAMPLE OF A NEW POST ********
<!---------- end of announcements ------------>
 
  +
<!---------------------------------------------->
 
  +
===== NanoFab making LN2 icecream =====
<endfeed />
 
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
<noinclude>[[Category:Templates]]</noinclude>
 
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
  +
  +
************* (end of example) **************
  +
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
  +
---------------------------------------------->

Revision as of 17:52, 19 April 2024

Multipal Tool DOWN!!! 4/24/2024 from 6am to 10 am

Below Mention Tools are down From 6am to 10am for maintenance in the chase. I will send an email once I have completed the maintenance. Please plan accordingly.-Mike Day

-PECVD # 1

-PECVD # 2

-Fluorine ICP

//Vraj Mehalana 17:48, 19 April 2024 (PDT)

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)