Difference between revisions of "Template:Announcements"
m (Deleted PEii repair) |
|||
(422 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
− | <!-- Description of the RSS feed --> |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
− | '''''Equipment Status''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Equipment Status ----------------> |
||
− | ===== |
+ | =====ICP1 Down===== |
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | UCSB Students, Staff and Faculty are required to recieve a Flu Vaccine by Nov. 1st. <br>Please see the '''[[COVID-19_User_Policies#UCSB_Flu_Vaccination_Mandate|COVID19 Page]]''' for relevant links and information. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
− | ===== |
+ | =====Job Opening: Process Engineer===== |
+ | The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time. |
||
⚫ | |||
− | Contact the [[Brian Thibeault|Lab Director]] for more information. |
||
+ | =====Lab Access Changes: Symmetry App===== |
||
− | ''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.'' |
||
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
||
⚫ | |||
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
⚫ | |||
− | ===== New Tool Installations ===== |
||
⚫ | |||
− | See the [https://wiki.nanotech.ucsb.edu/w/index.php/Main_Page#mp-trivia-h2 News Feed] for info on two upcoming tool installations! The [https://www.raith.com/products/velion.html?mobile=0 Raith Velion FIB] is up and running, we are eagerly awaiting Dr. Dan Read's arrival to bring this tool to life. See the [[Focused_Ion-Beam_Lithography_(Raith_Velion)|Velion's Tool page here]]. |
||
+ | In order for your post to show up correctly, you need to: |
||
− | |||
⚫ | |||
− | The [https://heidelberg-instruments.com/en/products/mla150.html Heidelberg MLA150 Maskless Aligner] has been installed, and is in the process of being qualified/characterized. See the [[Maskless_Aligner_(Heidelberg_MLA150)|MLA150's tool page here]]. |
||
+ | >> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~ |
||
− | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | |||
− | ===== Unaxis ICP-PECVD ===== |
||
− | The ICP-PECVD module is available upon request. Contact Tony Bosch if interested. System is using deuterated Silane for low loss optical films use only. |
||
− | |||
− | // [[User:Thibeault|Thibeault]] 14:22, 26 March 2020 (PDT) |
||
− | |||
− | ===== GCA Autostep Maintenance ===== |
||
− | 3C will be performing stepper maintenance starting the morning of October 23, 2020. The service will be completed in the afternoon Sunday October 25th. Please plan your process accordingly. |
||
− | |||
⚫ | |||
− | |||
− | ===== GCA 6300 Maintenance ===== |
||
− | The 6300 will be down the morning and afternoon Monday October 26, 2020 for maintenance. Please plan your process accordingly. |
||
− | |||
− | [[User:Silva|Silva]] 08:19, 23 October 2020 (PDT) |
||
− | |||
− | |||
− | |||
− | <!---------- end of Equipment Status ------------> |
||
− | <!----------------------------------------------> |
||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
⚫ | |||
− | |||
− | |||
− | |||
− | |||
⚫ | |||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
* Please use "There are no announcements at this time." if the announcements are empty. |
* Please use "There are no announcements at this time." if the announcements are empty. |
||
− | * URL to the RSS feed via FeedBurner (for Samsung display): http:// |
+ | * URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
− | * URL to the RSS feed directly from Wiki: https:// |
+ | * URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss |
Line 75: | Line 49: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
⚫ | |||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Revision as of 15:11, 19 April 2024
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)