+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
+ | |||
⚫ | |||
+ | |||
⚫ | |||
+ | The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. |
||
⚫ | |||
+ | |||
+ | =====DI and Waste Water systems===== |
||
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
⚫ | |||
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
⚫ | |||
+ | |||
=====Job Opening: Process Engineer===== |
=====Job Opening: Process Engineer===== |
||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
+ | |||
⚫ | |||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
− | |||
− | =====ProbeStation scheduled IT maintenance===== |
||
− | The probe station is up, only the computer is down. Standard electrical probe measurements are still available, just not automated plotting |
||
⚫ | |||
− | |||
⚫ | |||
− | Unfortunately PECVD2 is still down. |
||
− | |||
− | We replaced the MFC and ran into devicenet issues. |
||
− | I swapped the internal board with the old MFC and the devicenet issues appeared to be resolved. |
||
− | After another test run, there was no change in dep rate. |
||
− | |||
− | We will continue trouble shooting on Monday. |
||
⚫ | |||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
− | + | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
Revision as of 20:15, 10 April 2024
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ALD Oxford UP
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)