Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(Feed Appended)
(87 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====PECVD2 Planned Down Time for Maintenance 10-19-23=====
+
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
PECVD2 will be going down on Thursday October 19th for replacement of the hoist.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
This will be an all day event starting at 8:00am.
 
   
 
=====ALD Oxford UP=====
Please plan accordingly.
 
  +
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
This was originally planned for 10-2, but we had to reschedule due to other equipment down
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
//[[User:Mehalana v|Vraj Mehalana]] 15:18, 12 October 2023 (PDT)
 
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
=====Raith Velion - Velion repair - status update=====
 
  +
=====ICP1 Down=====
The new stage motor is now onsite and a Raith field service engineer will install it on Wednesday. I expect the tool will be returned to users on Friday, I'll update again if anything changes.
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
//[[User:Mehalana v|Vraj Mehalana]] 12:17, 11 October 2023 (PDT)
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
=====Unaxis ICP-PECVD is UP for Non-GapFill=====
 
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available.
 
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run.
 
Please plan your process accordingly.
 
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed.
 
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
   
=====Wafer Bonder, (Suss SB6-8E)=====
+
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
   
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
=====Dicing Saw (ADT) Upgrade 10/9=====
 
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 
ADT will be able to transfer your recipes from the GUI software to the NUI software. Please note that we do sometimes run into an issue with a recipe, as it is not a 100% perfect process, but the vast majority of the recipes do transfer over. If there are any you are concerned about, please make sure you have all parameters documented prior to us upgrading the machine.
 
Documentation of recipes is the user's responsibility, Staff will not be taking care of this.
 
-Lee
 
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT)
 
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
 
The scheduled maintenance activates on 9-28-23 have been cancelled and will be rescheduled at a later date. The tool is now available to be reserved for use on that date.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:29, 26 September 2023 (PDT)
 
   
  +
=====Lab Access Changes: Symmetry App=====
=====Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
The Autostep 200 will be undergoing maintenance and will be unavailable on the following dates and times:
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
(1) 09-30-23 8:00am-5:00pm
 
  +
(2) 10-01-23 8:00am-5:00pm
 
  +
=====Wafer Bonder, (Suss SB6-8E)=====
(3) 10-02-23 8:00am-12:00pm
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
Please plan your work activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:49, 27 September 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
===== EVG is down=====
 
We have received the part to repair the tool but we are still consulting with EVG as to who will be preforming the repair work. We hope to have a better handle on this early next week and will update everyone at that time. -Lee
 
//[[User:Mehalana v|Vraj Mehalana]] 10:51, 29 September 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 50: Line 36:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 20:15, 10 April 2024

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ALD Oxford UP

The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)