=====SEM 1 Update=====
+
=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
  +
We are postponing the Maintenance date to May 6th – 10th.
The field service engineer is finishing up mechanical alignments today and will move on to electronic alignments and current testing tomorrow. If everything continues to go well the tool should be available for use Thursday or Friday.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
We'll send out an email once the tool is back up.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:50, 14 July 2023 (PDT)
 
=====SEM 2 Update=====
 
Once SEM 1 is up we’ll wait for at least a week before we decommission SEM 2.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:16, 12 July 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
=====Plasma Activation (EVG 810)=====
 
  +
We have received almost all the replacement parts for the tool except the new chuck. The original delivery date of mid June has now been pushed out to early September and they have stated that this is the best that their supplier can do. I will not be installing any new parts on the tool until we have everything.
 
  +
=====ALD Oxford UP=====
Runs will still require Staff supervision until then.
 
  +
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter.
//[[User:Mehalana v|Vraj Mehalana]] 18:01, 2 May 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
  +
  +
=====DI and Waste Water systems=====
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
  +
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
 
<!--
Line 19: Line 36:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 20:15, 10 April 2024

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ALD Oxford UP

The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)