=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
=====Filmetrics F50: Down=====
 
  +
We are postponing the Maintenance date to May 6th – 10th.
The F50-WaferMapper’s laptop has a computer/RAM failure - we are working on a repair.
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//[[User:Mehalana v|Vraj Mehalana]] 11:09, 21 March 2023 (PDT)
 
  +
=====FEI SEM#1 Replacement Project=====
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
The FEI SEM #1 will be removed and replaced starting Friday March 17th. Both SEMs will be shut down and the SEM room will be off limits beginning at 8 am Friday and return to normal operations Tuesday morning the 21st.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:55, 16 March 2023 (PDT)
 
 
=====ALD Oxford UP=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter.
<!-- Description of the RSS feed -->
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
  +
  +
=====DI and Waste Water systems=====
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
 
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
  +
 
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
  +
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
  +
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 14: Line 36:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
===== Unaxis Etch: Down =====
 
We had to take the VAT controller off of this module to get the ICP-PECVD running. I have no immediate ETA for this system coming back online. Until we get this system running again you will need to use the Oxford Cobra system. -- Tony
 
// [[User:John d|John d]] 09:35, 13 February 2023 (PST)
 
 
===== Dektak XT ready for training =====
 
We have replaced the Dektak 6M with a new Dektak XT profilometer. The system is available for training, please [[Aidan_Hopkins|contact the tool supervisor]].
 
// [[User:John d|John d]] 10:08, 7 February 2023 (PST)
 
 
===== Au Plating: UP=====
 
only the full 100mm wafer fixture is available at the moment. You can plate smaller pieces on it with no issues.
 
// [[User:Mehalana v|Vraj Mehalana]] 12:35, 15 March 2023 (PDT)
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />
Line 35: Line 41:
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
====== HOW TO ADD ITEMS ======
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)

Revision as of 20:15, 10 April 2024

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ALD Oxford UP

The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)