Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted defunct announcements)
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====PECVD #2 is UP=====
+
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
The tool is up, intial film checks show same dep. rates as before.
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)
 
   
 
Please plan your work accordingly.
=====RIE 5 is up=====
 
RIE 5 is up except for processes that use SiCl4.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
+
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
   
  +
=====ALD Oxford UP=====
=====Dry Etch, Si Deep RIE (PlasmaTherm DSEIII) - DSE Update=====
 
  +
All three chambers are operating properly.
We received most of the chamber assembly replacement parts today. We are still waiting on the lamps and chamber o-rings which are scheduled to be delivered in the next couple of days. Once we have all the parts, we'll start to reassemble the chamber.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
I'll send out an update in the next 2-3 days.
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
Thanks,
 
 
=====ICP1 Down=====
//[[User:Mehalana v|Vraj Mehalana]] 10:58, 5 February 2024 (PST)
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
=====ICP #1 is down - Update=====
 
Replacing the battery on the board did not resolve the tool issue.
 
 
Panasonic has located a replacement board for the tool. From what I gather they need to repair and test it and are hoping to have it ready to ship by the 16th. I'd like to add that there is the possibility that this will not resolve the issue but it is the best path forward at this point.
 
 
-Lee
 
//[[User:Mehalana v|Vraj Mehalana]] 09:39, 30 January 2024 (PST)
 
 
=====EBeam3 Planned Maintenance 2/21/24 - 2/22/24=====
 
The transfer arm installation has been postponed until next week due to other equipment being down at this time.
 
 
The work is now scheduled for 2/21/24 - 2/22/24.
 
Please plan accordingly.
 
//[[User:John_d|Demis D. John]] 11:56, 13 February 2024 (PST)
 
   
 
=====Job Opening: Process Engineer=====
 
=====Job Opening: Process Engineer=====
Line 39: Line 26:
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)