Difference between revisions of "Template:Announcements"
(asml update) |
Mehalana v (talk | contribs) |
||
(41 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
− | ===== |
+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | The new CPU board we need is being shipped from overseas - will update when we have an ETA. |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
⚫ | |||
⚫ | |||
− | =====DUV Flood: UP with new procedure===== |
||
− | The new parts have been installed and the tool has been tested. |
||
⚫ | |||
− | We have added a timer that interlocks the lamp power supply since some users seem to have a problem remembering to turn the tool off when finished with it. The minimum time it can be set for is 30 minutes and the max is 3 hours. You will no longer be operating the main breaker on the front of the power supply. I have updated the SOP to reflect the changes, there is a copy at the tool and on its Wiki page: |
||
+ | =====ALD Oxford UP===== |
||
− | [[https://wiki.nanofab.ucsb.edu/w/images/8/89/DUV_Flood_Expose_SOP_Rev_C.pdf DUV_Flood_Expose_SOP_Rev_C.pdf]] |
||
+ | All three chambers are operating properly. |
||
− | // [[User:John_d Demis D. John]] 16:41, 4 January 2024 (PST) |
||
⚫ | |||
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
− | The tool will be undergoing maintenance and be unavailable the following dates and times: |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
||
− | |||
+ | =====ICP1 Down===== |
||
− | 1-18-24 at 8:00am to 1-18-24 at 6:00pm |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
− | |||
⚫ | |||
⚫ | |||
− | |||
− | Bill Millerski |
||
− | |||
⚫ | |||
− | |||
− | ===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance===== |
||
− | The tool will be undergoing maintenance and be unavailable the following dates and times: |
||
− | |||
− | 1-15-24 at 8:00am to 1-17-24 at 6:00pm |
||
− | |||
− | Please plan your processing activities accordingly. |
||
− | |||
⚫ | |||
=====Job Opening: Process Engineer===== |
=====Job Opening: Process Engineer===== |
||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
− | //[[User: |
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | |||
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
// [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
− | SUSS |
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)