Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(46 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
=====Stepper #1 (GCA 6300) - Scheduled Maintenance=====
+
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
   
 
Please plan your work accordingly.
1-18-24 at 8:00am to 1-18-24 at 6:00pm
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
Please plan your processing activities accordingly.
 
   
  +
=====ALD Oxford UP=====
Bill Millerski
 
  +
All three chambers are operating properly.
 
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
===== Stepper #2 (GCA Autostep 200) - Scheduled Maintenance=====
 
 
=====ICP1 Down=====
The tool will be undergoing maintenance and be unavailable the following dates and times:
 
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
1-15-24 at 8:00am to 1-17-24 at 6:00pm
 
 
Please plan your processing activities accordingly.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 21:49, 21 December 2023 (PST)
 
 
=====E-Beam #2 Heater is down - Update=====
 
I am fairly certain the heater controller has failed. I have spoken with the vendor and they are looking into it, but we will most likely have to send the unit in. I will push to have a replacement controller sent instead, but since this is a warranty repair they will probably want to eval it in-house. I would plan for it to be down for at least a couple of weeks. I'll send out an update once I have more info.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 16:24, 14 December 2023 (PST)
 
 
=====DUV is down - Update=====
 
contacted our vendor for an update and was told that the parts should ship by this Friday. If all goes well the tool should be up mid next week.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
 
 
=====PECVD2 Planned Down Time for Maintenance 12-11-23=====
 
PECVD2 will be going down on Monday 12-11-23 at 10:00am for replacement of the RF connector and RF Electrode.
 
 
When the work is complete, the process group will be running tests for the remainder of the afternoon.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:07, 13 December 2023 (PST)
 
=====Year End Shutdown=====
 
We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm.
 
The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd.
 
 
//[[User:Mehalana v|Vraj Mehalana]] 14:39, 16 November 2023 (PST)
 
   
 
=====Job Opening: Process Engineer=====
 
=====Job Opening: Process Engineer=====
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
 
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
   
//[[User:Mehalana v|Vraj Mehalana]] 14:52, 30 October 2023 (PDT)
+
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
   
 
=====Lab Access Changes: Symmetry App=====
 
=====Lab Access Changes: Symmetry App=====
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
=====Wafer Bonder, (Suss SB6-8E)=====
SUSS now aims to be on site in early February. I’ll will send out an email once I get confirmation for a specific date.
+
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)