+ | =====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th===== |
||
⚫ | |||
+ | ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from |
||
− | We will be shutting down lab operations Tuesday Dec 26th at 9 am for year end maintenance activities. The current plan is to be back open for operations Thursday Dec 28th at 2 pm. |
||
+ | Monday April 15th through April 19th. The tool will be unavailable for use during this time. |
||
+ | Please plan your work accordingly. |
||
− | The staff will be on Holiday Dec 25th & 26th, and January 1st & 2nd. |
||
⚫ | |||
⚫ | |||
− | =====PECVD2 is up for SiO2 and Std SiN Only===== |
||
+ | |||
− | We have adjusted recipes for SiO2 and Std SiN. These are available for use. Read the emails first. |
||
+ | =====ALD Oxford UP===== |
||
− | Low Stress SiN and a-Si are not yet adjusted and are not ready for use. We hope to have these done the week of 11/20 // [[User:Thibeault|Thibeault]] 09:10, 16 November 2023 (PST) |
||
+ | All three chambers are operating properly. |
||
⚫ | |||
+ | |||
+ | =====DI and Waste Water systems===== |
||
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
||
⚫ | |||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
=====Job Opening: Process Engineer===== |
=====Job Opening: Process Engineer===== |
||
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details. |
||
+ | |||
⚫ | |||
+ | //[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT) |
||
=====Lab Access Changes: Symmetry App===== |
=====Lab Access Changes: Symmetry App===== |
||
Line 19: | Line 29: | ||
=====Wafer Bonder, (Suss SB6-8E)===== |
=====Wafer Bonder, (Suss SB6-8E)===== |
||
− | + | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
|
⚫ | |||
⚫ | |||
<!-- |
<!-- |
||
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS. |
Revision as of 10:26, 25 March 2024
Stepper #3 (ASML DUV) - Down for PM on April 15th-19th
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.
Please plan your work accordingly.
//Vraj Mehalana 10:26, 25 March 2024 (PDT)
ALD Oxford UP
All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)