Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(72 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
<startfeed />
 
<startfeed />
  +
=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
=====ProbeStation scheduled IT maintenance=====
 
The ProbeStation will be undergoing IT maintenance and will be unavailable on the following dates :
+
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
* 10-30-23
 
* 10-31-23
 
Please plan your work activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:58, 17 October 2023 (PDT)
 
   
 
Please plan your work accordingly.
=====PECVD2 is UP=====
 
Initially it was planned to remove the hoist again to rebuild it to solve the leak.
 
   
  +
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
The manufacturer is sending out a rebuild kit under warranty since it is a brand new hoist that is leaking.
 
When that arrives I will schedule another all day event to rebuild the hoist.
 
   
 
=====ALD Oxford UP=====
I cleaned up the leaked oil, checked oil level, and did an inspection of the tool.
 
  +
All three chambers are operating properly.
System is back up and available for use.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:11, 23 October 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
=====Unaxis ICP-PECVD is UP for Non-GapFill=====
 
Tool is up for NON-GapFill (450W RF Bias) Recipes. Other Std SiO2/SiN deps are available.
 
Next Week Monday Oct 16th to Wed 18th we will allow GapFill (450W RF Bias) recipes to be run.
 
Please plan your process accordingly.
 
Also we are still testing our own GapFill recipe that hopefully reduces flakes. Once this is ready you’ll want to qualify our new recipe to make sure it works for your application, as the old GapFill recipe will eventually be deprecated & disallowed.
 
   
  +
=====DI and Waste Water systems=====
//[[User:Mehalana v|Vraj Mehalana]] 09:55, 11 October 2023 (PDT)
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
 
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
=====Wafer Bonder, (Suss SB6-8E)=====
+
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
+
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
   
===== Dicing Saw Upgrade - Update=====
+
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
The upgrade work on the saw is completed. My plan is to work on updating the SOP and running some more tests tomorrow and Monday. If all goes smoothly I should be ready to start re-training users on Tuesday, so I should be sending out an email some time Monday in regard to the re-training schedule.
 
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
  +
=====Wafer Bonder, (Suss SB6-8E)=====
-Lee
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
//[[User:Mehalana v|Vraj Mehalana]] 13:25, 3 October 2023 (PDT)
 
 
=====EVG Activation: Up=====
 
The FSE has completed the work on the tool and I have made several test runs without issue.
 
 
IMPORTANT - Please see corresponding email for changes in operation.
 
//[[User:Mehalana v|Vraj Mehalana]] 15:58, 24 October 2023 (PDT)
 
 
<!--
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
Line 47: Line 38:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)