=====Stepper #3 (ASML DUV) - Down for PM on April 15th-19th=====
=====Unaxis ICP-PECVD is DOWN=====
 
  +
ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from
RF1 continues to be a problem. I will start the process of elimination from a hardware point of view Monday. Once I resolve the hardware issue our Process group will be exclusively running the system for about a week. During this time we will NOT be allowing anyone else to use the system. Sorry for the inconvenience.
 
  +
Monday April 15th through April 19th. The tool will be unavailable for use during this time.
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 22 September 2023 (PDT)
 
=====Wafer Bonder, (Suss SB6-8E)=====
 
The top heater has failed. We are currently in the process of trying to source a new heater. we will send out an email once I have an update.
 
   
  +
Please plan your work accordingly.
//[[User:Mehalana v|Vraj Mehalana]] 09:59, 20 September 2023 (PDT)
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 10:26, 25 March 2024 (PDT)
=====Dicing Saw (ADT) Upgrade 10/9=====
 
The dicing saw is scheduled go down for an upgrade on Monday October 9th and will be down for that week and into the weekend. Part of the upgrade will be updated software and will require users to be re-trained. I will provide more info on the re-training once I get a little hands on time with the updated software.
 
I'll send out a couple of reminder emails between now and then and keep everyone updated in the event the schedule for this changes.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:33, 6 September 2023 (PDT)
 
   
=====Stepper #1 (GCA 6300) Scheduled Maintenance=====
+
=====ALD Oxford UP=====
  +
All three chambers are operating properly.
The tool has been scheduled for maintenance on 9-28-23 from 8:00am to 5:00pm. During this time the tool will be unavailable for use. Please plan your lab activities accordingly.
 
//[[User:Mehalana v|Vraj Mehalana]] 10:13, 6 September 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
=====EVG is up=====
+
=====DI and Waste Water systems=====
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
The work on the tool has been completed and it is available for use without Staff supervision. We made 30 runs on the tool without any high reflected power issues, but the possibility still remains that it could happen. System available for use.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:16, 22 September 2023 (PDT)
+
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
  +
  +
=====Job Opening: Process Engineer=====
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
  +
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
  +
  +
=====Lab Access Changes: Symmetry App=====
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
  +
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
  +
 
=====Wafer Bonder, (Suss SB6-8E)=====
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
 
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
 
<!--
Line 27: Line 38:
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
 
-->
 
-->
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
 
 
<!---------- end of Equipment Status ------------>
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
 
<endfeed />
 
<endfeed />

Revision as of 10:26, 25 March 2024

Stepper #3 (ASML DUV) - Down for PM on April 15th-19th

ASML Engineers will be on-site to perform the Annual Periodic Maintenance on the tool from Monday April 15th through April 19th. The tool will be unavailable for use during this time.

Please plan your work accordingly.

//Vraj Mehalana 10:26, 25 March 2024 (PDT)

ALD Oxford UP

All three chambers are operating properly. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)